News
-
16.12.
After a long preparation and planning phase the...
-
16.12.
Part of the hydrogeological surveys is the long-term...
-
16.12.
After long preparation phase and another long journey from...
-
16.12.
Together with local partner ZAWA UST team rolled out the...
-
16.12.
Constructions begin in project area. The local water...
-
16.12.
After a long preparation and planning phase the...
-
16.12.
Part of the hydrogeological surveys is the long-term...
-
16.12.
After long preparation phase and another long journey from...
-
16.12.
Together with local partner ZAWA UST team rolled out the...
-
16.12.
Constructions begin in project area. The local water...